Hell Gate and Harlem River Black Start

This Project was a Design-Build for the New York Power Authority. Dynamic Provided the Design and Installation to Ensure the Black-Start Capabilities of New York Power Authority SCPP Hell Gate and Harlem River. Work Included the installation of (2) 1MW diesel generators with auxiliary equipment and work at 138kV Con Edison switchyard.

night scene of modern waterfront villa with meadow outdoors and illuminated sky