This Project was a Design-Build for the New York Power Authority. Dynamic Provided the Design and Installation to Ensure the Black-Start Capabilities of New York Power Authority SCPP Hell Gate and Harlem River. Work Included the installation of (2) 1MW diesel generators with auxiliary equipment and work at 138kV Con Edison switchyard.
Client: New York Power Authority
Construction Manager: New York Power Authority