NYC College of Technology Centralized Heating and Cooling Plant

Installation of (3) Field Erected 450HP Boilers, a Chiller Plant with (4) 900 Ton Chillers and New Electric Service and Distribution to the Building. Replacement of over 50 Air Handling Units Throughout Occupied Building. The project also included a 150-foot Stainless Steel Architectural Trellis Structure that was Welded / Fabricated Off-Site and Brought to the Site and Rigged in Place. A Building Management System, 1000KW Emergency Generator and New 2,000 Gallon Underground Oil Tank was Installed as Part of this Project.